How It Works

Interested in using AeroBarrier on your project?

Getting started is easy.

  • Request a quote here
  • Contact us here 
  • schedule a time to meet with us here

 

How It Works:

Once we arrive at the job site, the AeroBarrier 5-step process is implemented.

 

Step 1 – Setup Equipment

Equipment is set up at the job site. Conveniently transported by trailer, AeroBarrier install equipment is mobile and portable. The equipment includes a compressor, generator, blower door, emitters, hoses, and the AeroBarrier machine.

 

 

Step 2 – Prep the Area

Prep the space. This includes taping or covering any areas that won’t be sealed. Emitters are then set up throughout the area to be sealed.

 

 

Step 3 – Pressurize the Space

Pressurize the space with the use of a blower door. A computer does the rest, including the control of temperature, pressure, humidity, and distribution of sealant during the process

 

 

Step 4 – Real-time Results

See the results in real-time. Throughout the application process, the computer monitor displays the ACH improvement, allowing you full control over your desired level of envelope tightness and the leakage reduction.

 

 

Step 5 – Printed Report – Results Guaranteed

Run a final blower door test to verify the sealing results. At the end of the process, receive an AeroBarrier Certificate, with a pre and post leakage report.

Contact Us!

We love hearing from Builders, Architects, Dealers, and others who are interested in AeroBarrier. Send us a message.

AeroBarrier News

News, White Papers, Case Studies, and Energy Efficiency Stories